Sign Permit Application

INSTALLING OR MODIFYING A COMMERCIAL SIGN?

New or revised signs will require a review for Planning Application requirements.

  • For info on City's Sign code, click "development code" in blue menu bar to right

Building Dept. permit/approval could also be required.

For Planning Dept.

For the Building Dept.

  • Determine if the sign requires a Structural Permit.  Link to State of Oregon Structural Specialty Code below; https://codes.iccsafe.org/content/OSSC2019P1
  • If a permit is required, then contractors must apply via Oregon e-permit to create their e-permit record.  Be sure to select; "Commercial -  Structural" permit;    https://aca-oregon.accela.com/oregon
  • We do not offer on-line plan review, you will need to submit 2-sets of plans for the Building Official review.  (If no Structural Permit is required, then no plans are required)
  • Once approved, you will receive 1-approved set of plans to be kept at the job site.
  • ***NOTE; If the sign will be illuminated then an Electrical Permit would also be required.  All Electrical Permits are issued & inspected through COLUMBIA COUNTY LAND DEVELOPMENT located at the County Offices in St. Helens, they also use Oregon e-permit or call them at; 503-397-1501.

BOTH OUR PLANNING AND BUILDING DEPARTMENTS DO NOT OFFER ON-LINE PLAN REVIEW.

  • The preferred plan size is 11"x17"  or  if legible 8.5"x11"
  • The standard concurrent review time is approx. 2-weeks.

Business License;

All contractors must have a valid City of Scappoose Business License. Scappoose is not within the Portland Metro area. 

Open link for application;  www.scappoose.gov/cityhall/page/outside-city-limits-business-license-application  

 

Economic Development

More info on starting/operating a Business in Scappoose;

https://www.scappoose.gov/ed/page/starting-and-operating-business-scappoose